Hotline:
The second public announcement of the environmental impact assessment of the heavy steel structure production project of Guangdong Hongchuang Heavy Industry Co., Ltd.
Release Time: 2022-08-18 10:54
Guangzhou Environmental Protection Engineering Design Institute Co., Ltd. accepted the entrustment of "Guangdong Hongchuang Heavy Industry Co., Ltd. Heavy Steel Structure Production Project" environmental impact report preparation, after many efforts, the project environmental impact report has been compiled ( first draft). The relevant EIA situation is now publicized to the public as follows:
I. Project construction summary
Project Name: Heavy Steel Structure Production Project of Guangdong Hongchuang Heavy Industry Co., Ltd.;
Constructor: Guangdong Hongchuang Heavy Industry Co., Ltd.;
Project Nature: New;
Construction location: No. 1, No. 501, Gaoming Avenue Middle, Yanghe Town, Gaoming District, Foshan City (Building No. 8) (N: 22°51′28.67″;E: 112°43′55.6″);
Project Overview: The total investment of this project is 67.5 million yuan, covering an area of 13968m2. Among them, the main buildings are production workshops, office buildings and canteens. The factory has processes such as cutting, welding, grinding, shot blasting, and painting.
2. An overview of the possible impact of construction projects on the environment
1. Construction period
This project rents a factory built by Foshan Gaoming Jiye Cold Rolled Steel Co., Ltd. for production. The project has been stationed in the equipment, and the installation and commissioning of environmental protection equipment is currently underway. Since there is no civil construction in this project, the impact during the construction period is small.
2. Operation period
The emission concentration and emission rate of the dust produced by the shot blasting of this project can meet the corresponding requirements of the second period of the second period of the local standard "Air Pollutant Emission Limits" (DB44/27-2001) in Guangdong Province. ;The organic waste gas (total VOCs, xylene) produced by coating can meet the emission concentration and emission rate of "Surface Coating (Automobile Manufacturing) Volatile Organic Compound Emission Standard" (DB44/803-2010) after treatment The corresponding requirements for the emission limit in the second period; the metal dust generated by steel plate cutting and grinding, and the fume generated by welding are discharged in an unorganized form after being treated by a mobile bag filter; the kitchen fume exhaust gas can meet the "Food Fume Emission Standard for Catering Industry" after treatment (Trial)" (GB18483-2001) standard, the impact on the atmospheric environment is small.
The sewage discharged from the project is domestic sewage. The domestic sewage is treated by the integrated domestic sewage treatment facility and reaches the second-level standard of the Guangdong Provincial Local Standard "Water Pollutant Discharge Limits" (DB44/26-2001) in the second period. The nearby Jinzhou Chung has little impact on the nearby water environment.
The corner waste and metal recycling dust are recycled by the material recycling department; paint residue, hydrocyclone recycling wastewater, waste paint buckets and waste solvent buckets, waste activated carbon, waste mineral oil are recycled by qualified units; domestic waste is handed over to The sanitation department cleans up; kitchen waste is handed over to qualified units for disposal. The impact on the environment is minimal.
The noise equipment of the project has been well controlled. It is predicted that the factory boundary can meet the standard, and the impact on the surrounding environment is small.
There are no major hazards in this project. Items that may cause environmental risks in the production system and production unit are propane, paint and thinner, all of which do not exceed the storage critical amount, and the probability of risk is small. The project construction unit must attach great importance to and strictly implement the various risk prevention measures proposed in the report, and all environmental risk accidents are controllable.
Three points of countermeasures and measures to prevent or reduce adverse environmental impacts during project operation
1. Water pollution prevention and control measures: Domestic sewage is discharged into Chauyong after being treated by the integrated domestic sewage treatment facility.
2. Air pollution prevention and control measures: the shot blasting dust is discharged from the 15m exhaust pipe after being treated by the self-contained filter cartridge dust collector; the coating organic waste gas is treated by "low temperature plasma + activated carbon adsorption" and then discharged from the 15m exhaust pipe The metal dust produced by steel plate cutting and grinding and the fume produced by welding are discharged in an unorganized form after being treated by a mobile bag filter; the kitchen oil fume is discharged by a 15m exhaust pipe after being treated by an electrostatic oil fume purifier.
3. Solid prevention and control measures: corner waste and metal recycling dust are recovered by the material recycling department; paint residue, hydrocyclone circulating wastewater, waste paint buckets and waste solvent buckets, waste activated carbon, and waste mineral oil are handed over to qualified units Recycling; domestic waste is handed over to the sanitation department for cleaning; kitchen waste is handed over to qualified units for disposal.
4. Noise prevention and control measures: adopt low-noise equipment, install foundation shock absorption when installing noise equipment, install vibration isolation pads at the same time, and adopt independent airtight vehicle sound isolation; It has reached the Class 3 standard limits in the "Environmental Noise Emission Standard for Industrial Enterprises" (GB12348-2008).
IV. Environmental risks and corresponding environmental risk prevention and emergency measures
There are no major hazards in this project. Items that may cause environmental risks in the production system and production unit are propane, paint and thinner, all of which do not exceed the storage critical amount, and the probability of risk is small. The project construction unit must attach great importance to and strictly implement the various risk prevention measures proposed in the report, and all environmental risk accidents are controllable.
V. Key points of environmental impact assessment conclusions
The construction project conforms to the corresponding industrial policies and urban planning, and conforms to the relevant laws and regulations. After the construction unit takes reasonable and effective treatment measures according to the requirements of the EIA, the waste water, waste gas, noise, solid waste, etc. of the construction project can be discharged up to the standard, and the construction of this project will not have a significant impact on the surrounding environment. The site selection and construction of the project are feasible from the perspective of environmental protection.
6. The public understands the details of the project and the method and time limit for obtaining supplementary information
Learn about the details of the project and the method and time limit for requesting supplementary information: The public can learn about the project details and request supplementary information from the construction unit or EIA unit by phone or email within 10 working days after the announcement of this announcement. information.
7. The scope and main issues of soliciting public opinions
Scope of soliciting public opinions: surrounding residents and related groups within the evaluation area.
The main matters for soliciting public opinions: whether the public is satisfied with the status quo of the environmental quality of the location of the construction project; how did the public learn about the project; What are the suggestions and requirements for the environmental protection of the construction project?
8. Specific forms of soliciting public opinions
After the relevant information is disclosed, the public can consult the EIA preparation unit or the EIA entrusting unit by email or letter and put forward relevant opinions and suggestions.
IX. The starting and ending time of public comments
The publicity period is from December 8, 2015 to December 21, 2015, a total of 10 working days.
Contact information of construction unit
Name of construction unit: Guangdong Hongchuang Heavy Industry Co., Ltd.;
Address: No. 501, Gaoming Avenue Middle, Yanghe Town, Gaoming, Foshan, Guangdong;
Contact: Mr. Zhou;
Tel: 13825192529;
Evaluation unit contact information
Name of evaluation unit: Guangzhou Environmental Protection Engineering Design Institute Co., Ltd.;
Address: No. 20 Zengsha Street, Huilong Road, Guangzhou;
Contact: He Gong;
Tel: 020-83363613;
E-mail: 296167252@qq.com.
Guangdong Hongchuang Heavy Industry Co., Ltd.
December 8, 2015